# GCC operating models: captive, BOT, hybrid and GCC-as-a-service

> "Captive or outsourced" is no longer the choice. Companies now build centres with partners and take them over, rent a ready-made centre, own the core and buy the run, or run a hub in one country with spokes in another. This guide compares the models on what decides them: control, speed, cost, risk and the path to ownership, and shows how centres move from delivering tasks to owning products and processes.

Source: https://ciohelm.com/guides/gcc-operating-models · By the CIO Helm team · Updated 2026-11-16

## Six ways to run a centre

| Model | What it is | Best when |
| --- | --- | --- |
| **Captive** | Your own legal entity, your own leaders, your own employees, built by your team with advisers. | You know the country, the scope is large and long-term, and you want full control from day one. |
| **Build, operate, transfer (BOT)** | A partner sets up the entity or a dedicated unit, hires and runs the team for 18 to 36 months, then transfers it to you at a price fixed in the contract. | You want ownership in the end but speed and local know-how now. |
| **Managed or partner-led centre** | A provider runs a dedicated team for you in its own premises, under its employment, for as long as the contract runs. | The work is stable and well documented and you do not need to own the people. |
| **GCC-as-a-service** | A provider gives you a ready-made centre: seats, employer of record, payroll, HR, IT and compliance, while you lead the work and choose the people. | You start small, want your own team and culture, and do not want an entity yet. |
| **Hybrid** | You own the core (engineering, data, cyber, global processes) and a provider runs the rest (support, service desk, transactional work). | Part of the scope is differentiating and part is commodity. |
| **Joint venture or joint centre of excellence** | A shared unit with a provider, sometimes with shared risk and reward, often for a technology or an industry platform. | You need skills neither side has alone, and both sides gain from the result. |

## The models compared

| Criterion | Captive | BOT | Managed | GCC-as-a-service | Hybrid |
| --- | --- | --- | --- | --- | --- |
| **Control of talent and know-how** | Full | Full after transfer | Low | High, without the entity | Full for the core |
| **Time to first team** | 4 to 6 months | 2 to 4 months | 3 to 6 months | 1 to 3 months | Mixed |
| **Run cost at scale** | Lowest | Fee until transfer, then lowest | Highest | Medium: a fee per head | Medium |
| **Upfront effort and risk** | Highest | Medium | Low | Low | Medium |
| **Employer brand** | Your own | Partner's, then yours | Provider's | Yours, on a provider's payroll | Split |
| **Flexibility to scale down** | Low | Medium until transfer | High | High | Medium |
| **Exit** | Close or sell an entity | Call option, or walk away before transfer | Contract notice | Contract notice, people may move | Mixed |

In a worked example of 220 FTE of work moving from Western Europe to Pune and Manila, the BOT was the cheapest over five years, saving USD 39.3 million against today's cost, and the captive only caught up with its run-rate cost in year 5. The [cost guide](https://ciohelm.com/guides/gcc-cost-india-vs-philippines) shows the full comparison.

## Shape: hub-and-spoke, centre of excellence or full stack

The operating model says who owns and runs the centre. The shape says what it does and where.

- **Hub-and-spoke:** one main hub with the leadership, engineering and shared services, and one or more spokes in a second city or country for specific work or resilience. A common pattern: engineering and data in an Indian hub, service desk and finance operations in a Philippine spoke.
- **Centre of excellence:** a focused team that owns one capability for the whole group, such as data science, cyber operations, test automation or ERP. Small, specialised and easy to start, but it can stay isolated.
- **Full-stack multi-function centre:** technology, engineering and business operations in one centre, with end-to-end ownership of products or processes. Harder to build, but it is where centres create the most value and attract the best leaders.

## Four maturity stages

| Stage | What the centre does | Who leads | How it is measured |
| --- | --- | --- | --- |
| **1. Delivery centre** | Executes tasks defined at headquarters: development, testing, support, transactions. | A site leader reporting to an operations or IT manager. | Cost per FTE, service levels, hiring to plan. |
| **2. Capability centre** | Owns whole services or business lines end to end, with its own architects and managers. | A centre head with first global roles in the centre. | Quality, productivity, ownership of services. |
| **3. Portfolio owner** | Owns products, platforms or global processes, and runs centres of excellence in AI, data or cyber. | Global process owners and product leaders based in the centre. | Business outcomes of the portfolio, innovation delivered. |
| **4. Transformation hub** | Leads group-wide change, works with start-ups and universities, shapes strategy. | Leaders reporting to the group executive from the centre. | Contribution to revenue, margin and transformation goals. |

Decide the target stage for year three before you choose the model. A centre meant to reach stage 3 needs a path to ownership and leaders who can hold global roles; a centre that will stay at stage 1 does not.

## How to choose

Answer five questions in this order:

1. **Is the work core?** If it holds your intellectual property, your customer data or your differentiation, you want to own it in the end: captive, BOT or hybrid.
2. **How big and how long?** Below a few dozen people, or for less than three years, an own entity rarely pays: managed team or GCC-as-a-service.
3. **How fast?** If savings or skills are needed within the year, a partner model starts sooner than a captive.
4. **Do you know the country?** Without people who have set up there before, a BOT or GCC-as-a-service buys the local knowledge.
5. **What can your leaders take on?** A captive needs a strong centre head and time from headquarters leaders for at least a year.

Then score the models on weighted criteria with the cost from your model as one of them, and check that the answer holds when the weights move.

## How the model changes over time

The model you start with is rarely the one you have in year five. Three common paths:

- **BOT, transfer, then expand as a captive.** The partner builds the first 150 to 250 people; after transfer, you grow the centre yourself and add centres of excellence.
- **GCC-as-a-service, then own entity.** Start with a team on a provider's payroll; set up your entity and move the people across once the team is large enough.
- **Outsourced run, captive core.** Keep providers for stable run work and build an own team for engineering and data, then bring run work in once the centre is mature.

## Leadership models that work

- **Two-in-a-box:** each critical role in the centre is paired with a counterpart at headquarters, with shared goals, until the centre leader can hold the role alone.
- **Global process owners in the centre:** moving ownership of a process, not only its execution, is what moves a centre from stage 2 to stage 3.
- **Leaders first:** hire the centre head and the heads of function before the first wave, and give them a real say in hiring.
- **A clear story for the centre:** people join and stay for scope, ownership and careers. A centre described as a cost saving attracts and keeps the wrong people.

## Pitfalls of each model

| Model | Pitfall | How to avoid it |
| --- | --- | --- |
| **Captive** | Slow start, leaders hired late, entity work underestimated. | Hire the centre head first, run the entity setup in parallel with site selection, budget a year of headquarters time. |
| **BOT** | Transfer price left to a later valuation; people decline to transfer; contractors' work not assigned. | Fix the price method at signing, budget retention for transfer day, assign all intellectual property in the contract. |
| **Managed** | Knowledge stays with the provider; price rises every year. | Knowledge management obligations, named key people, price caps and a tested exit plan. |
| **GCC-as-a-service** | Your team on someone else's payroll, with their policies. | Agree the transfer of people to your entity upfront, with its cost. |
| **Hybrid** | Two cultures and blurred boundaries between the core and the run. | Clear service boundaries, one governance forum, the same service measures. |

### From decision to a running centre: the GCC Setup Kit

An operating model selector, a location scorecard for India and the Philippines, the entity, legal and tax checklist, a 0 to 18 month roadmap, organisation design with role profiles, governance, the transition and knowledge transfer plan, the GCC business case deck and the operating models deck, all filled in for a worked example. One-time price , no subscription.

[Get the kit](https://ciohelm.com/download/gcc-setup-kit)[See what is inside](https://ciohelm.com/toolkits/gcc-setup-kit)

## Questions

**What is the difference between a GCC and outsourcing?**

A global capability centre is the company's own capability abroad: its people, its leaders and its knowledge, even when a partner builds or hosts it. Outsourcing buys an outcome or capacity from a provider, whose people and know-how stay with the provider.

**How long does a BOT last?**

Usually 18 to 36 months of operation after the build, then the transfer. Shorter is possible for a small team; longer usually means the transfer conditions were not clear.

**What is GCC-as-a-service?**

A provider supplies the centre's infrastructure and employment (seats, employer of record, payroll, HR, IT, compliance) while you lead the work and choose the people. It is a fast way to start without an entity and a common first step before a captive.

**Should a GCC report to the CIO?**

A centre that serves several functions usually reports to a group executive (often the COO, CFO or a head of global business services), with each function owning the work it receives. A technology-only centre often reports to the CIO. Either way, give the centre head a seat in the forums where its work is decided.

**How do we manage concentration risk?**

Measure it on the criticality and share of global volume handled by the centre, not headcount; set thresholds for critical work; and plan a second city or country, cross-training and a tested continuity plan, reported to the board once a year.

## Toolkits on this topic

- [GCC Partner RFP Pack](https://ciohelm.com/toolkits/gcc-partner-rfp-pack): choose a build, operate, transfer partner for your capability centre
- [GCC Cost Model](https://ciohelm.com/toolkits/gcc-cost-model): price a global capability centre in India or the Philippines four ways

## Related

- [GCC cost in India and the Philippines: captive, BOT or outsource](https://ciohelm.com/guides/gcc-cost-india-vs-philippines)
- [Global capability centres: the CIO Helm GCC toolkit](https://ciohelm.com/gcc)
- [IT operating model: assess it and design the target](https://ciohelm.com/guides/it-operating-model)
- [Software selection: how to choose a vendor without regret](https://ciohelm.com/guides/software-selection)
